Engineering, Procurement &
Construction up to 400 kV

ADECO is an EPC partner in power transmission and utility infrastructure, delivering projects from engineering through to energisation on a turnkey basis. Our capabilities span the full project lifecycle: route survey, detailed engineering, procurement, construction, testing and commissioning, executed to standards of safety, constructability, statutory compliance and system reliability, with single-point accountability throughout.

We work with utilities, industrial clients and developers on transmission lines up to 400 kV, substations up to 220 kV, and underground EHV cable systems, as well as the line diversions and realignments that release constrained land for development.

Sq.Ft. Under Management
0 M+
Active FM Sites
0 +
Deployed Personnel
0 +
SLA Compliance Rate
0 %
Avg. Cost Reduction for Clients
0 %

Integrated EPC Capability

ADECO delivers each project as a single, coordinated scope rather than a series of handoffs. This integration is what protects programme, cost and quality on infrastructure where all three are unforgiving.

Survey and route optimisation

Route surveys and route optimisation are completed before construction is scoped, establishing site constraints and cost with certainty at the outset.

Detailed engineering

Full design of lines, structures and substations, including foundation and structure design, load studies and material specification.

Procurement

Sourcing of conductors, towers, monopoles, cable systems and associated equipment to project specification.

Construction

Erection, stringing and installation across overhead and underground systems.

Testing and commissioning

Complete testing, commissioning and energisation, with statutory sign-off.

Scope of Work

Transmission Lines up to 400 kV

Underground EHV Cable Systems​

Substations up to 220 kV

Approvals and Shutdown Planning

Utility approvals and statutory coordination are managed in parallel with construction, and outage windows are sequenced against the programme so that execution is not held up by clearances. When a shutdown window is available, work is planned to use it fully.

Network Diversions and Land Optimisation

Existing transmission infrastructure often constrains how a site can be developed. ADECO assesses the network, site conditions and development plans together, then engineers diversion, realignment or undergrounding solutions that release developable land, reduce project risk and optimise cost, with no compromise to safety or system reliability. For developers and industrial clients, this converts a fixed site constraint into usable, revenue-generating land.

Why ADECO

Still have questions?

Our team is available Mon–Sat, 9:00am–6:00pm IST and responds within 24 Hrs.

Talk to Our Team

+91 - 0124 – 4015499

Ready to Simplify Your

Power Transmission EPC?

Talk to our professional team about your site. Give us the size, the location and the services you need covered. We will put together a customised proposal within 24 hours.

Coming Soon