Downloads > Corporate Presentation / Brochure / Profile

Downloads

Adeco Adeco Adeco Adeco

 

Following projects have been successfully executed and commissioned by the ADECO team for HARYANA VIDYUT PRASARAN NIGAM LIMITED (HVPNL), during the period 2009 to 2013.

  • Conversion of overhead 66KV S/C RICO line on 24th May, 2009

  • LILO of one circuit of 66KV D/C B/pur Dundahera line at captive generation plant at DLF, Gurgaon

  • LILO for 66LV S/L Gurgaon-Maruti line at 66KV captive power generation plant at Silokhera, Gurgaon with 7 Nos. 66KV D/C C Type Towers with associated material on 14th January, 2011

  • Conversion of 66KV D/C DLF Q Block to Dundahera Phase IV line(Part) from overhead line to underground cable (with size 1C X 1200 sq.mm) on 10 July, 2011

  • Conversion of 66KV overhead line to underground cable (size IC X 1200 sq. mm, approx. 5700 meters) in DLF Alameda, Sector 73, Gurgaon in February 2013

  • Conversion of 66KV D/C Harsaru-Pataudi line from overhead line to underground cable through XLPE cable (size IC X 1200 sq. mm, approx. 7600 meters) in new alignment between tower location no. 14 to no. 18, at Sector 95, Gurgaon in May 2013

Ask Us

Name:*
Company:
E-Mail:*
Tel.:*
City:
*
Code :* verification image
Copyright @ 2014 ADECO Energy India Pvt. Ltd. All rights reserved. Developed by: Gyan Vandana Technologies